{"id":17711,"date":"2022-02-18T16:33:10","date_gmt":"2022-02-18T16:33:10","guid":{"rendered":"http:\/\/localhost:10020\/energy-hub-nominated-for-archdaily-2022-building-of-the-year-award\/"},"modified":"2023-04-17T09:09:54","modified_gmt":"2023-04-17T09:09:54","slug":"energy-hub-nominated-for-archdaily-2022-building-of-the-year-award","status":"publish","type":"post","link":"https:\/\/www.eocengineers.com\/fr\/energy-hub-nominated-for-archdaily-2022-building-of-the-year-award\/","title":{"rendered":"Energy Hub nominated for ArchDaily 2022 Building of the Year Award"},"content":{"rendered":"<p>We\u2019re delighted to hear that Energy Hub has been nominated for the ArchDaily 2022 Building of the Year Award.<\/p>\n<p class=\"text16px\">The four-storey Energy Hub will provide heat and hot water to almost 3,000 new homes being built as part of the \u00a32.3bn Elephant Park development.<\/p>\n<p class=\"text16px\">Eckersley O&#8217;Callaghan assisted Morris+Company in preparing facade tender information and monitoring the contractor during construction.<\/p>\n<p class=\"text16px\">The projecting \u201cPOD windows\u201d were required to meet stringent thermal performance standards. We contributed to the design development of a bespoke system by performing 2D heat transfer simulation studies, ensuring that the facade met the thermal performance requested.<\/p>\n<p class=\"text16px\">To find out more read our <strong><a href=\"https:\/\/www.eocengineers.com\/projects\/energy-hub-413\/\">case study<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We\u2019re delighted to hear that Energy Hub has been nominated for the ArchDaily 2022 Building of the Year Award. The four-storey Energy Hub will provide heat and hot water to almost 3,000 new homes being built as part of the \u00a32.3bn Elephant Park development. Eckersley O&#8217;Callaghan assisted Morris+Company in preparing facade tender information and monitoring &hellip; <a href=\"https:\/\/www.eocengineers.com\/fr\/energy-hub-nominated-for-archdaily-2022-building-of-the-year-award\/\">Continued<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-17711","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/17711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/comments?post=17711"}],"version-history":[{"count":4,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/17711\/revisions"}],"predecessor-version":[{"id":21242,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/17711\/revisions\/21242"}],"wp:attachment":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/media?parent=17711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/categories?post=17711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/tags?post=17711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}