{"id":24541,"date":"2024-06-12T12:15:03","date_gmt":"2024-06-12T12:15:03","guid":{"rendered":"https:\/\/www.eocengineers.com\/?p=24541"},"modified":"2024-06-12T12:21:18","modified_gmt":"2024-06-12T12:21:18","slug":"pedestrian-footbridges-at-the-henderson-nearing-completion","status":"publish","type":"post","link":"https:\/\/www.eocengineers.com\/fr\/pedestrian-footbridges-at-the-henderson-nearing-completion\/","title":{"rendered":"Pedestrian Footbridges at The Henderson Nearing Completion"},"content":{"rendered":"\n<p>The three 60m pedestrian footbridges at the bottom of <a href=\"https:\/\/www.eocengineers.com\/projects\/the-henderson\/\" data-type=\"link\" data-id=\"https:\/\/www.eocengineers.com\/projects\/the-henderson\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>The Henderson<\/strong><\/a> are nearing completion. Last month, Associate <a href=\"https:\/\/www.linkedin.com\/in\/ACoAAAugBPAB2dgiodpb3kbXTyZxkr4WFqt1i60\" target=\"_blank\" rel=\"noopener\"><\/a><a href=\"https:\/\/www.eocengineers.com\/about-us\/our-team\/nuno-barbedo\/\" data-type=\"link\" data-id=\"https:\/\/www.eocengineers.com\/about-us\/our-team\/nuno-barbedo\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Nuno Barbedo<\/strong><\/a> visited 2 Murray Road, including the banquet hall. We are providing integrated structural and facade engineering for the deck structure, roof envelope, glass balustrades, and metal cladding.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/www.eocengineers.com\/cdn-cgi\/image\/format=avif\/wp-content\/uploads\/2024\/06\/Nuno-1-1024x722.jpg\" alt=\"\" class=\"wp-image-24560\" style=\"object-fit:cover\" srcset=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-1-1024x722.jpg 1024w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-1-300x212.jpg 300w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-1-768x541.jpg 768w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-1.jpg 1234w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\"><br>The steel deck and roof structure were designed with very tight geometrical constraints. The double-curved stainless-steel cladding, manufactured by <a href=\"https:\/\/www.kikukawa.com\/en\/\" data-type=\"link\" data-id=\"https:\/\/www.kikukawa.com\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>KIKUKAWA <\/strong><\/a> in Japan, creates an elegant feature that serves as the main access to the building from the Mass Transit Railway.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-2-1024x722.jpg\" alt=\"\" class=\"wp-image-24558\" style=\"object-fit:cover\" srcset=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-2-1024x722.jpg 1024w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-2-300x212.jpg 300w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-2-768x541.jpg 768w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-2.jpg 1234w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\"><br>The bridge steelwork is supported on a series of discrete column locations that weave through and interface with the new office, requiring precise coordination. The complex geometry of the cladding system is fully integrated with the structure to minimise the overall buildup, meeting the tight zoning requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/www.eocengineers.com\/cdn-cgi\/image\/format=avif\/wp-content\/uploads\/2024\/06\/Nuno-3-1024x722.jpg\" alt=\"\" class=\"wp-image-24563\" style=\"object-fit:cover\" srcset=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-3-1024x722.jpg 1024w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-3-300x212.jpg 300w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-3-768x541.jpg 768w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2024\/06\/Nuno-3.jpg 1234w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\"><br>The bridge is already open to the public and they are finalising some cladding works. We look forward to seeing the project complete! <br><br>Client: <a href=\"https:\/\/www.hld.com\/en\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Henderson Land Development Company Limited<\/strong><\/a><br>Architects: <a href=\"https:\/\/www.zaha-hadid.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Zaha Hadid Architects<\/strong><\/a> |<strong> <a href=\"https:\/\/rlp.asia\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Ronald Lu &amp; Partners<\/a><\/strong><br>Local Structural Engineers:<strong> <a href=\"https:\/\/cmwal.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">C M Wong and Associates Ltd<\/a><\/strong><br>Contractors: <a href=\"https:\/\/seele.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>seele<\/strong><\/a> | <a href=\"https:\/\/www.linkedin.com\/company\/hip-hing-construction-company-limited\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Hip Hing Construction Company Limited<\/strong><\/a> | <a href=\"https:\/\/www.bloomberg.com\/profile\/company\/7778904Z:HK\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>PMB Cyberwall Ltd<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The three 60m pedestrian footbridges at the bottom of The Henderson are nearing completion. Last month, Associate Nuno Barbedo visited 2 Murray Road, including the banquet hall. We are providing integrated structural and facade engineering for the deck structure, roof envelope, glass balustrades, and metal cladding. The steel deck and roof structure were designed with &hellip; <a href=\"https:\/\/www.eocengineers.com\/fr\/pedestrian-footbridges-at-the-henderson-nearing-completion\/\">Continued<\/a><\/p>\n","protected":false},"author":6,"featured_media":24560,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-24541","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/24541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/comments?post=24541"}],"version-history":[{"count":17,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/24541\/revisions"}],"predecessor-version":[{"id":24585,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/24541\/revisions\/24585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/media\/24560"}],"wp:attachment":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/media?parent=24541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/categories?post=24541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/tags?post=24541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}