{"id":26213,"date":"2025-01-08T15:10:14","date_gmt":"2025-01-08T15:10:14","guid":{"rendered":"https:\/\/www.eocengineers.com\/?p=26213"},"modified":"2025-02-26T16:32:29","modified_gmt":"2025-02-26T16:32:29","slug":"325-deansgate-tops-out","status":"publish","type":"post","link":"https:\/\/www.eocengineers.com\/fr\/325-deansgate-tops-out\/","title":{"rendered":"325 Deansgate Tops Out"},"content":{"rendered":"\n<p>Our project at <strong><a href=\"https:\/\/www.eocengineers.com\/projects\/325-deansgate\/\" data-type=\"link\" data-id=\"https:\/\/www.eocengineers.com\/projects\/325-deansgate\/\" target=\"_blank\" rel=\"noreferrer noopener\">325 Deansgate<\/a><\/strong> in Manchester has officially reached the important milestone of &#8216;topping out&#8217;. The last floor deck at level 22 was poured as 2024 came to a close, signifying the completion of the primary structural frame.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2025\/02\/Deansgate-LARGE-1-1024x722.jpg\" alt=\"\" class=\"wp-image-26247\" srcset=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2025\/02\/Deansgate-LARGE-1-1024x722.jpg 1024w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2025\/02\/Deansgate-LARGE-1-300x212.jpg 300w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2025\/02\/Deansgate-LARGE-1-768x541.jpg 768w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2025\/02\/Deansgate-LARGE-1.jpg 1234w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\"><br>18 storeys of the 22-storey tower overhang the Grade II listed Deansgate Castlefield viaduct, carrying TfGM Metrolink, which remains operational at all times during construction.<br><br>We designed a series of efficient 18-storey Vierendeel frames to act as a permanent structure supporting the cantilever. In order to make sure the Vierendeel frames are fully engaged, the frame was built off a temporary one-storey deep steel truss with a series of jacks propping the permanent frame.<br><br>Now, the full height frame has been built and the jacks slowly released, allowing the structure to take its final permanent form.<br><br>Read more on the project <strong><a href=\"https:\/\/www.eocengineers.com\/projects\/325-deansgate\/\" data-type=\"link\" data-id=\"https:\/\/www.eocengineers.com\/projects\/325-deansgate\/\" target=\"_blank\" rel=\"noreferrer noopener\">here.<\/a><\/strong><br><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our project at 325 Deansgate in Manchester has officially reached the important milestone of &#8216;topping out&#8217;. The last floor deck at level 22 was poured as 2024 came to a close, signifying the completion of the primary structural frame. 18 storeys of the 22-storey tower overhang the Grade II listed Deansgate Castlefield viaduct, carrying TfGM &hellip; <a href=\"https:\/\/www.eocengineers.com\/fr\/325-deansgate-tops-out\/\">Continued<\/a><\/p>\n","protected":false},"author":6,"featured_media":26247,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-26213","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/26213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/comments?post=26213"}],"version-history":[{"count":3,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/26213\/revisions"}],"predecessor-version":[{"id":26277,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/26213\/revisions\/26277"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/media\/26247"}],"wp:attachment":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/media?parent=26213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/categories?post=26213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/tags?post=26213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}