{"id":30055,"date":"2026-09-14T09:01:43","date_gmt":"2026-09-14T09:01:43","guid":{"rendered":"https:\/\/www.eocengineers.com\/?p=30055"},"modified":"2026-09-14T09:01:45","modified_gmt":"2026-09-14T09:01:45","slug":"sydney-harbour-bridge-cycleway-ramp-shortlisted-for-istructe-2026","status":"publish","type":"post","link":"https:\/\/www.eocengineers.com\/fr\/sydney-harbour-bridge-cycleway-ramp-shortlisted-for-istructe-2026\/","title":{"rendered":"Sydney Harbour Bridge Cycleway Ramp shortlisted for IStructE 2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.eocengineers.com\/projects\/sydney-harbour-bridge-cycleway\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Sydney Harbour Bridge Cycleway Ramp<\/strong><\/a> has been shortlisted in the <a href=\"https:\/\/www.istructe.org\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>IStructE<\/strong><\/a> Structural Awards 2026.<\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\">Set within the heritage context of Bradfield Park, the 190m ramp replaces the 55 steps cyclists previously had to navigate to cross the Harbour Bridge, delivering a continuous, accessible route between the bridge cycle path and Milsons Point.<\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\">Our team led the structural engineering and industrial design, from the sweeping steel deck to the cast-bronze balustrade, working alongside <a href=\"https:\/\/www.aspect-studios.com\/projects\/sydney-harbour-bridge-cycleway-ramp\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>ASPECT Studios<\/strong><\/a>, <a href=\"https:\/\/www.collinsandturner.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Collins and Turner Architects<\/strong><\/a>, <a href=\"https:\/\/design5.com.au\/index.php\/portfolio\/sydney-harbour-bridge-cycleway\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Design 5 Architects<\/strong><\/a> and the wider project team for <a href=\"https:\/\/www.transport.nsw.gov.au\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Transport for NSW<\/strong><\/a>.<\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\">Congratulations to everyone involved on this project!<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/www.eocengineers.com\/cdn-cgi\/image\/format=avif\/wp-content\/uploads\/2026\/09\/Sydney-Cycleway_003_credit-website-1024x722.png\" alt=\"\" class=\"wp-image-30057\" srcset=\"https:\/\/www.eocengineers.com\/wp-content\/uploads\/2026\/09\/Sydney-Cycleway_003_credit-website-1024x722.png 1024w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2026\/09\/Sydney-Cycleway_003_credit-website-300x212.png 300w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2026\/09\/Sydney-Cycleway_003_credit-website-768x541.png 768w, https:\/\/www.eocengineers.com\/wp-content\/uploads\/2026\/09\/Sydney-Cycleway_003_credit-website.png 1234w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Sydney Harbour Bridge Cycleway Ramp has been shortlisted in the IStructE Structural Awards 2026. Set within the heritage context of Bradfield Park, the 190m ramp replaces the 55 steps cyclists previously had to navigate to cross the Harbour Bridge, delivering a continuous, accessible route between the bridge cycle path and Milsons Point. Our team led &hellip; <a href=\"https:\/\/www.eocengineers.com\/fr\/sydney-harbour-bridge-cycleway-ramp-shortlisted-for-istructe-2026\/\">Continued<\/a><\/p>\n","protected":false},"author":45,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-30055","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/30055","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/users\/45"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/comments?post=30055"}],"version-history":[{"count":3,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/30055\/revisions"}],"predecessor-version":[{"id":30062,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/posts\/30055\/revisions\/30062"}],"wp:attachment":[{"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/media?parent=30055"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/categories?post=30055"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eocengineers.com\/fr\/wp-json\/wp\/v2\/tags?post=30055"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}